Remodel: Days 10-14

Monday: Lots of mechanicals–new return air in the wall instead of an awkward floor space. Wall placement for pipe decisions. Rest of the wall in the master bath and bed removed. Hardwood floors have been patched in a few places.

Nancy and Jen walked through the door sizes and hall bath decisions with us. Nancy also pulled out a paint swatch fan. I broke out in hives.

Tuesday: Patio door gone. Window installed.

Wednesday: Guys were finishing a punch list at the previous job.

Thursday: Leaking chimney down. Roof repaired over it. Some brick work done under the new window.

Friday: Tile arrived! Brick is nearly done under the window. Drywall mud is in and drying. A few windows gained some trim.