Remodel: Days 15-19

Monday: Can lights in the master bath and lots of drywall patching. Kitchen/dining room tile was laid out in two patterns. Herring bone all the way!

Tuesday: Left Italian beef in the crock pot for the guys. Bribery with hot food is useful with men. Tile has started to go down. More work on trim and drywall.

Wednesday: Half the kitchen and dining room tile is laid. Wall is up to create a full kitchen. Cabinets arrive tomorrow!

Thursday: Kitchen is tiled. Master closet is walled in. Lots of drywall done. Subpanel installed. Master bath shower laid out in cardboard. Decisions made about the hall shower door. And one of the guys brought birthday cake. It’s a good day!

Friday: Kitchen tile is finished. Master bath has plumbing. Drywall is getting closer to being done. Sub panel is in. Everything is looking amazing!