Remodel: Days 20-24

Monday: Lots of plumbing today. It didn’t go perfectly, so the guys didn’t get much done by way of cabinets.

Tueaday: More plumbing. A little unboxing of cabinets. Some tile rework in the kitchen.

Wednesday: Came home to all the lower cabinets installed. Paint samples up on the walls. More plumbing and drywall done. Live edge mantle made.

Thursday: Upper cabinets are in place. A few more paint samples are up. Doors are moved inside. A little more plumbing is done. Deanna cooked the guys meatballs for lunch.

Friday: Electrical box all in place. A few more paint samples went up. Tinsmith in the kitchen and rainwashed and window pane in the bedrooms and bathrooms. Chicken tacos for lunch today. There was also some target practice in the backyard after the day was finished.